Library First Floor Closed May 13th – May 21st

May 12, 2019 to May 21, 2019 All Day

Brooks Memorial Library

224 Main Street, Brattleboro, VT

Rotating Construction Schedule:

Sections of the library’s first floor and mezzanine will be curtained off and closed from May 13 through June 4 including two days (May 20 and 21) when the entire lower level will be inaccessible. We thank you for your patience as we install a new ceiling, more efficient lighting, and air vents that will minimize noise while making the most of our new HVAC system. The Children’s Room and Teen Room will be open throughout these phases of construction.

The full construction schedule and details on services

Monday May 13 – Tuesday May 21:
First floor reading room and stacks closed.
Mezzanine open through Saturday, May 18, for reading and browsing.
Note: both levels will be closed May 20 and 21.
There will be no public access to the printer, scanner or photocopier.
Arrived holds and items from the mezzanine can be checked out at a temporary service desk on the  mezzanine, but other services will be limited.
The Children’s Room and Teen Room WILL BE OPEN.

Monday May 20 – Monday May 27:
Mezzanine closed.
On May 20 and 21, both the mezzanine and the entire first floor will be closed. Read more…

Leave a Reply