Construction Update
Brattleboro NH PC 25(6)
Brattleboro NH PC 25(5)
Brattleboro-Putney PS 25(11)
DATE: Wednesday, November 26th, 2025
Due to the Thanksgiving Holiday, crews will be off the project by Noon today and return on Monday, December 1st at 7:00 a.m.
TRAFFIC IMPACTS:
Brattleboro NH PC 25(6) and Brattleboro-Putney STP PS 25(11)
Work is finishing up throughout the project limits for the season and crews will be accessing the shoulders of all project routes as well as approach routes during day time hours Monday through Friday next week.
CONSTRUCTION ACTIVITIES:
Brattleboro NH PC 25(6)
This project is now substantially complete. Crews will be working to remove construction approach signs next week during the day.
Brattleboro-Putney STP PS 25(11)
Crews have finished work on the U.S. Route 5 ditchline between Brattleboro and Putney for the season. They will be demobilizing from their yard and covering construction signs along this corridor until next spring.
LOCATION:
This contract is a composite of three separate paving projects with detailed locations listed below. It includes all Class 1 limits of Brattleboro which are typically noted by a sign stating “State Highway Ends” and “State Highway Begins”. Work to be done on these projects includes coarse milling (grinding off the top layers of pavement) to a depth of 2 inches and paving a ½ inch leveling course and then a 1 ½ inch top course of asphalt. ADA evaluation of sidewalk and pedestrian crossings, sign replacement, guardrail repair and replacement, center line rumble strip location evaluation and installation, drainage work, and other highway improvements are also planned as a part of these projects.
Brattleboro PC25(5)
VT 9: The project begins at Edward Heights intersection and extends approximately 1.7 miles east to the I-91 Exit 2 interchange.
Brattleboro PC25(6) – Substantially Complete
U.S. 5: The project begins at the intersection with Generous Street and extends approximately 1.9 miles north to the Vermont Avenue intersection.
VT 9: The project begins at I-91 Exit 2 interchange and extends approximately 1.0 mile east to the intersection with U.S. 5 at the traffic signal.
VT 30: The project begins at the U.S. 5 and VT 30 interchange and follows VT 30 three tenths of a mile north to approximately the intersection with Cedar Street.
VT 142: The project begins at the Class 1 limit sign just south of the railroad tracks near Riverside Drive and follows VT 142 north to the intersection with U.S. 5 at the traffic signal, skipping over the newly paved portion of VT 142 completed for the Brattleboro-Hinsdale bridge project.
Brattleboro-Putney STP PS25(11)
U.S. 5: The project begins on U.S. 5 in Brattleboro at the “State Highway Begins” sign at the intersection with Vermont Avenue and extends northerly along U.S. 5 for approximately 8.0 miles to just north of the Putney Landing Road intersection in Putney. Work will also take place within the roundabout and from the roundabout east to the New Hampshire state line on VT 9.
BRATTLEBORO NH PC25(6) INTERIM COMPLETION: Fall 2025
OVERALL PROJECT COMPLETION: Fall 2026
Contact Information:
Name – Bethany Oprendek
Phone – 802.267.4044
Email – bethany@bbo-enterprises.com







