Construction Update
Brattleboro-Putney PS 25(11)
Brattleboro NH PC 25(6)
Brattleboro NH PC 25(5)
DATE: Wednesday, March 25th, 2026
Construction is scheduled to resume on U.S. Route 5 from Brattleboro to Putney on Monday, April 6th during daytime hours.
Crews will begin to mobilize anticipating their start of work on the U.S. 5 portion of the project from north of the Interstate 91 overpass (just south of the intersection with Bennet Drive) and progressing north to Putney. Restricted shoulders and single-lane closures with alternating traffic patterns controlled by flaggers will be in place as needed.
Weekly email updates including traffic impacts and construction activities will resume next week. If you are being forwarded this email and wish to sign up for these communications directly, please click the link below or email Bethany Oprendek at bethany@bbo-enterprises.com.
Map of U.S. 5 day-time work project locations.
LOCATION:
This contract is a composite of three separate paving projects with detailed locations listed below. It includes all Class 1 limits of Brattleboro which are typically noted by a sign stating “State Highway Ends” and “State Highway Begins”. Work to be done on these projects includes coarse milling (grinding off the top layers of pavement) to a depth of 2 inches and paving a ½ inch leveling course and then a 1 ½ inch top course of asphalt. ADA evaluation of sidewalk and pedestrian crossings, sign replacement, guardrail repair and replacement, center line rumble strip location evaluation and installation, drainage work, and other highway improvements are also planned as a part of these projects.
Brattleboro-Putney STP PS25(11)
U.S. 5: The project begins on U.S. 5 in Brattleboro at the “State Highway Begins” sign at the intersection with Vermont Avenue and extends northerly along U.S. 5 for approximately 8.0 miles to just north of the Putney Landing Road intersection in Putney. Work will also take place within the Exit 3 roundabout and from the roundabout east to the New Hampshire state line on VT 9.
Brattleboro PC25(5)
VT 9: The project begins at Edward Heights intersection and extends approximately 1.7 miles east to the I-91 Exit 2 interchange.
Brattleboro PC25(6) – Substantially Complete in 2025
U.S. 5: The project begins at the intersection with Generous Street and extends approximately 1.9 miles north to the Vermont Avenue intersection.
VT 9: The project begins at I-91 Exit 2 interchange and extends approximately 1.0 mile east to the intersection with U.S. 5 at the traffic signal.
VT 30: The project begins at the U.S. 5 and VT 30 interchange and follows VT 30 three tenths of a mile north to approximately the intersection with Cedar Street.
VT 142: The project begins at the Class 1 limit sign just south of the railroad tracks near Riverside Drive and follows VT 142 north to the intersection with U.S. 5 at the traffic signal, skipping over the newly paved portion of VT 142 completed for the Brattleboro-Hinsdale bridge project.
PROJECT COMPLETION: Fall 2026
Contact Information:
Name – Bethany Oprendek
Phone – 802.267.4044
Email – bethany@bbo-enterprises.com








