Shore Road Building Fire

At 5:05am Central Dispatch received a call for a building fire at 25 Shore Dr. Engine 2 and Ladder 1 out of Central Station and Engine 4 out of Station 2 responded on a 1stalarm. Upon arrival at 5:13am Engine 2 reported heavy fire showing from the front of the building and ordered a 2ndalarm be struck, recalling all off duty Brattleboro Firefighters and bringing all Brattleboro apparatus to the scene. Engine 4 laid a supply line to Engine 2 from a hydrant on Eaton Ave and Engine 2 crew stretched a 2 ½” attack line, knocked down a big volume of fire from the outside, the advanced an attack line to the interior of the house. Information was quickly gathered that all of the occupants were out of the house and uninjured. Extinguishment of the fire continued by the interior crew and as more help arrived additional attack lines were stretched to help with fire attack. The fire was declared under control at 7:18am.