I-91 Bridge Project: Lane and Exit Closings July 12
The Southbound lane of I-91 between Exits 3 and 2 and the Exit 3 on-ramps will be closed to all vehicles on Sunday, July 12 from 5:00 AM to 9:00 AM to make it possible to conduct a routine bridge inspection. This time period was selected because it is the period of lowest traffic volume during the daylight hours needed to conduct the inspection.
Southbound traffic will be routed to Exit 1, and Northbound traffic attempting to use the Exit 3 on ramp will be routed north on Route 5 to Exit 4. Officers will be on hand to control traffic.
I-91 Northbound will remain open.

