Filling the Void Left by Vermont Yankee
A recent program on Vt. Public Radio reported that energy leaders from across the state met in Vernon Sept 12th to help the town plan for life after Vermont Yankee.
Entergy closed VY in December, 2014, leaving behind an enormous switchyard that can handle hundreds of megawatts of electricity from a power plant.
The town wants to replace VY’s tax base — and lost jobs — and with those high voltage transmission lines, Vernon is looking for an energy project that could make use of the electrical infrastructure.

